March 2017: BWC commence ground works at a 5-storey high end residential house in Greenwich, London.
Works include underpinning of 3 underground vaults at the front of the house to create a walk-
in shower room, toilet, bathroom and utility room.
March 2017: BWC commence ground works at a 5-storey high end residential house in Greenwich, London.
Works include underpinning of 3 underground vaults at the front of the house to create a walk-
in shower room, toilet, bathroom and utility room.